    Unconfirmed AI value (simulated): Building Length (L)Step 01 · Cover

    A-101 · p.1 (Plan Width — Simulated) · 97% confidence. Simulated demo provenance; Review and confirm this value before final sign-off.

  • WARN
    Unconfirmed AI value (simulated): Building Width (B)Step 01 · Cover

    A-101 · p.1 (Plan Depth — Simulated) · 96% confidence. Simulated demo provenance; Review and confirm this value before final sign-off.

  • WARN
    Unconfirmed AI value (simulated): Mean Roof HeightStep 01 · Cover

    A-201 · p.3 (Elevations — Simulated) · 91% confidence. Simulated demo provenance; Review and confirm this value before final sign-off.

  • WARN
    Unconfirmed AI value (simulated): Roof TypeStep 02 · Vertical Loads

    A-101 · p.1 (Roof Notes — Simulated) · 89% confidence. Simulated demo provenance; Review and confirm this value before final sign-off.

  • WARN
    Unconfirmed AI value (simulated): Foundation TypeStep 02 · Vertical Loads

    S-201 · p.2 (Foundation Plan — Simulated) · 92% confidence. Simulated demo provenance; Review and confirm this value before final sign-off.

  • WARN
    Unconfirmed AI value (simulated): Floor Plan AreaStep 07 · Floor Weight

    A-101 · p.1 (Roof/Floor Plan — Simulated) · 95% confidence. Simulated demo provenance; Review and confirm this value before final sign-off.

  • WARN
    Unconfirmed AI value (simulated): Exterior PerimeterStep 07 · Floor Weight

    A-101 · p.1 (Exterior Perimeter — Simulated) · 94% confidence. Simulated demo provenance; Review and confirm this value before final sign-off.

  • WARN
    Allowable soil bearing is ASSUMED — no geotechnical reportStep 01 · Cover

    ASSUMED — no geotechnical report. Confirm allowable soil bearing pressure (1,500 psf per CBC Table 1806.2) or enter the geotechnical report number and date.

  • WARN
    Beams: H1 — review assumptionsStep 03 · Beams

    Legacy UDL shear reduction assumes NDS 2024 §3.4.2.2(a) bearing/load-face conditions.; Dry service, normal temperature, unincised rectangular edgewise bending assumed. Self-weight density is an explicit legacy assumption; verify project weight.

  • WARN
    Beams: B1 — review assumptionsStep 03 · Beams

    Legacy UDL shear reduction assumes NDS 2024 §3.4.2.2(a) bearing/load-face conditions.; Dry service, normal temperature, unincised rectangular edgewise bending assumed. Self-weight density is an explicit legacy assumption; verify project weight.

  • WARN
    Beams: H2 — review assumptionsStep 03 · Beams

    Legacy UDL shear reduction assumes NDS 2024 §3.4.2.2(a) bearing/load-face conditions.; Dry service, normal temperature, unincised rectangular edgewise bending assumed. Self-weight density is an explicit legacy assumption; verify project weight.

  • WARN
    Seismic Cs: S1 ≥ 0.60gStep 06 · Seismic Cs

    ASCE 7-22 Eq. 12.8-6 minimum Cs = 0.0462 applies.

  • OK
    Cover: Checks OKStep 01 · Cover

    Required data is available and no blocking checks were found in this step.

  • OK
    Vertical Loads: Checks OKStep 02 · Vertical Loads

    Required data is available and no blocking checks were found in this step.

  • OK
    Beams: Checks OKStep 03 · Beams

    Required data is available and no blocking checks were found in this step.

  • OK
    Posts: Checks OKStep 04 · Posts

    Required data is available and no blocking checks were found in this step. Steel posts: Not used. Shear tabs: Not used.

  • OK
    Wind: Checks OKStep 05 · Wind

    Required data is available and no blocking checks were found in this step.

  • OK
    Seismic Cs: Checks OKStep 06 · Seismic Cs

    Required data is available and no blocking checks were found in this step.

  • OK
    Floor Weight: Checks OKStep 07 · Floor Weight

    Required data is available and no blocking checks were found in this step.

  • OK
    Shear Line Load: Checks OKStep 08 · Shear Line Load

    Required data is available and no blocking checks were found in this step.

  • OK
    Shear Walls: Checks OKStep 09 · Shear Walls

    Required data is available and no blocking checks were found in this step.

  • OK
    Diaphragm: Checks OKStep 10 · Diaphragm

    Required data is available and no blocking checks were found in this step.

  • OK
    Pad Footing: Checks OKStep 11 · Pad Footing

    Required data is available and no blocking checks were found in this step.

  • OK
    Spread Footing: Checks OKStep 12 · Spread Footing

    Required data is available and no blocking checks were found in this step.

  • OK
    Gravity Studs: Checks OKStep 13 · Gravity Studs

    Required data is available and no blocking checks were found in this step.

  • OK
    Stud Wall (legacy): Checks OKStep 14 · Stud Wall (legacy)

    Required data is available and no blocking checks were found in this step.

  • OK
    Code editions match CBC 2025Step 01 · Cover

    All referenced editions match CBC 2025.

  • OK
    Wind and seismic both checkedStep 08 · Shear Line Load

    Every shear line has wind and seismic shear computed.

  • OK
    Collectors and drag struts confirmedStep 10 · Diaphragm

    Collectors are confirmed or no diaphragm is present.

  • OK
    Deferred submittals listedStep 01 · Cover

    All suggested deferred submittals are listed on the cover.

  • OK
    Special inspections listedStep 01 · Cover

    All suggested special inspections are listed on the cover.

Back to Demo